
After Repair
The highway after the job has been completed.

Foam
After the foam is injected under slab the foam will expand and harden to lift the slab.

Ports
Small holes are drilled into the concrete where the foam will be injected.

After Lifting
After the foam has been injected and repaired the slabs.