The Mausoleum
A 1960’s mausoleum undergoes concrete lifting and leveling to provide safe, and appealing, walkways for visitors.
Large Tripping Hazards
Sinking concrete has created large tripping hazards for visitors. Leaving the area unsafe to visit loved ones.
Sinking Concrete
Sinking concrete has created an unwanted slope to the burial sites.
Typical Sealant
Old sealant could not adhere with the sinking concrete.
Flat Walkways Once Again
Tripping hazards are no longer an issue at the mausoleum.
Applying NexusPro
After PolyLevel, workers apply NexusPro Joint Sealant to protect the treated and untreated areas.
Proper Sealant
All areas are sealed with NexusPro Joint Sealant.
Safe Mausoleum Walkways
The mausoleum once again has level walkways allowing visitors to safely visit their loved ones.